British Standard fuse-link IEC BS88 gG Type A4 415VAC 240VDC 160A BTFP Offset Tag
* fuse-base (possibly including terminal covers and phase barriers)
* fuse-link with blade contact
* fuse-link replacement device (LV HRC fuse puller)
Since the design of this system cannot guarantee non-interchangeability of rated current it must be handled by a qualified professional.
Thanks to its modular system, the ProGrid solution allows the installation of individual components, it offers the user the possibility of a quick and easy installation as well as a high degree of protection during installation and maintenance with its two-stage opening: in parallel then in rotation, patented by MERSEN.
2 alternative designs are available for a user-friendly installation according to the needs:
- The standard ProGrid fuse switch disconnector to protect the substation from overcurrent and interrupt the electrical circuit’s flow.
- The smart ProGrid fuse switch disconnector to monitor energy flow in addition to its standard functions; the ProGrid solution can be retrofitted from Standard ProGrid to Smart ProGrid also on customer side.
NH Fuse switch disconnector ProGrid Size 1 690VAC 250A 3x1-pole switching Bus bar system 185 mm Bolt
NH Fuse switch disconnector ProGrid Size 1 690VAC 250A 3x1-pole switching Bus bar system 185 mm Bolt CT1A
NH Fuse switch disconnector ProGrid Size 1 690VAC 250A 1x3-pole switching Bus bar system 185 mm double V-clamp Aluminium
Thanks to its modular system, the ProGrid solution allows the installation of individual components, it offers the user the possibility of a quick and easy installation as well as a high degree of protection during installation and maintenance with its two-stage opening: in parallel then in rotation, patented by MERSEN.
2 alternative designs are available for a user-friendly installation according to the needs:
- The standard ProGrid fuse switch disconnector to protect the substation from overcurrent and interrupt the electrical circuit’s flow.
- The smart ProGrid fuse switch disconnector to monitor energy flow in addition to its standard functions; the ProGrid solution can be retrofitted from Standard ProGrid to Smart ProGrid also on customer side.
Safety challenges, protection architectures & technology trends 2026